This webinar will discuss both US FDA Guidance Documents: “Deciding When to Submit a 510(k) for a Change to an Existing Device”; and “Deciding When to Submit a 510(k) for a Software Change to an Existing Device“; both dated November 16, 2017. It will examine the broad range of issues to be considered by a company when reviewing 1) a series of minor changes or 2) one major change to an existing product having an existing 510(k), for the need for a new 510(k). Such a review takes on added urgency as a result of the stated intent of the Agency to get tougher across the board in its expectations for the medical industry and what it (the FDA and industry) need to do to "toughen" the 510(k) process. A review of recent information from the Agency, as well as other goals of the Agency that have already been translated into action in the past years will provide direction in areas of concern and what to expect in the future. This will assist documenting the 510(k) submission (or 'not') rationale.
Course Objectives:
The FDA expects companies to perform meaningful, results driven 510(k) / change analysis activities. The company is held fully responsible for deciding when a new 510(k) filing is warranted. The old K97-1 Memorandum was replaced by two Guidance Documents, one on devices and one on device software changes: “Deciding When to Submit a 510(k) for a Change to an Existing Device”; and “Deciding When to Submit a 510(k) for a Software Change to an Existing Device“; both dated November 16, 2017 Growing high-profile field problems indicate that change control and it’s effect on regulatory review activities are not yet fully utilizing the power of current risk management tools, which must be a part of such an analysis . A growing push by the Agency to strengthen the 510(k) process, and review existing devices with above normal adverse events are additional results. The required documented change review actions are not rocket-science, but require the implementation of formal methods with documented, and defensible, rationale.
Why Should You Attend:
Every change to a medical device must be evaluated by the company as to (i) it’s individual effect on the previously FDA-cleared 510(k), regarding safety and effectiveness, and (ii) the latest changet and all previous changes cumulative effects on the past FDA-cleared 510(k), as to the need to file a new 510(k). U.S. FDA's two guidance documents (and the old K-97 memo) on device and software changes, their flowcharts and questions as to when to file a new 510(k), wlil be discussed.
Course Outline:
• FDA Device Clearance / Changes in Direction
• Capturing Changes
• Requirements for Product Changes and When to File a New 510(k)
• Manufacturing, Labeling, Tech/Performance and/or Materials Changes
• Tracking / Evaluating Changes and the "Tipping Point"
• Using FDA's Guidance "Decision Trees" Model / Matrix
• Documenting the process
• Resolving a "Wrong" Decision.
What You Get:
• Training Materials
• Live Q&A Session with our Expert
• Participation Certificate
• Access to Signup Community (Optional)
• Reward Points
Who Will Benefit:
• Senior and Middle Management
• Validation
• Marketing
• Production
• QA/RA
• Supervisors
• R&D
• Manufacturing Engineering
• Software Engineering
• Operations
• Production
Two New FDA Draft Guidance Documents: Medical Devices and 510k Submission
Get Instant Access 90 Minutes View Program |
How the FDA are Trained for Medical Device Inspections
Get Instant Access 90 Minutes View Program |
Reprocessing Reusable Medical Devices Cleaning & Labeling Requirements
Get Instant Access 90 Minutes View Program |
Quality Metrics and Risk Based Inspections: Quality Metrics Guidance for Industry & Safety and Innovation Act (FDASIA)
Get Instant Access 60 Minutes View Program |
ISO 13485: 2016 - Understanding and Implementing The International Medical Device Quality Standard
Get Instant Access 90 Minutes View Program |
Get Instant Access On-Demand Access
Preparing for the ICE Storm: What to Do During I 9 Audits and ICE Raids
Janette S. Levey
Human Resources
Get Instant Access On-Demand Access
OSHA Inspections and Investigations-How to Manage Them
Irwin Dobrushin
Environment Health and Safety | OSHA
Get Instant Access On-Demand Access
29 CFR 1904: OSHA's New Injury Recordkeeping E-Submission Rule
Occupational Safety and Health Administration
Get Instant Access On-Demand Access
Working with Excel Databases: Sort, Filter, Subtotal and More
Cathy Horwitz
Cross Industry | Skill Enhancement
Get Instant Access On-Demand Access
Writing Audit Reports
Jonnie T. Keith CIA, CFE, CGAP, CICA
Governance, Risk and Compliance
Get Instant Access On-Demand Access
BSA Reporting Requirements
Banking and Financial Services Industry
Get Instant Access On-Demand Access
Human Factors-Usability Based on ISO 62366
Medical Device | Diagnostic | Pharmaceutical | Biologics fields
Get Instant Access On-Demand Access
Chat GPT for Project Managers
Charles H. Paul
All FDA Regulated Industry